少妇高潮呻吟A片免费看软件,少妇邻居做爰2伦理,巜疯狂的少妇4做爰BD,少妇厨房愉情2,少妇荡乳1一5潘金莲,少妇与公做了夜伦理69

Today:
首頁(yè) > English > News Gallery > Company Everts > Company News

MBEC Wins the Bid of Sichuang-Tibet Highway Reconstruction Project

Source:    Date:2012-08-20  

Recently, MBEC won the bid of section II of national highway No. 318 Sichuang-Tibet highway (Tibet side) Tongmai to No.105 reconstruction project. The accepted contract amount is 344.5 million RMB and the construction period is 3 years.


The total length of this section is 2.8 km, including subgrade, pavement, super major bridge and culvert etc. Polonggou super major bridge e is a composite cable-stayed Bridge with a main span of 430m.. The middle span of the main girder is composite girder, the side span is prestressing concrete girder. The span arrangement is (45+50+60+430+60+50+46)m.. This bridge has been recognized as the “First Bridge” of Tibet. The total length of the culvert is 1390m and the construction method is drilling and blasting method.

up:

next:

欢迎光临: 临江市| 阜宁县| 宜春市| 北辰区| 博客| 曲沃县| 阳泉市| 新乡县| 犍为县| 叶城县| 峨眉山市| 太康县| 阿瓦提县| 永州市| 宿松县| 星子县| 宁津县| 丘北县| 旬阳县| 吉水县| 临朐县| 新竹县| 潮安县| 南城县| 拉孜县| 精河县| 乌拉特后旗| 佛学| 南康市| 留坝县| 星子县| 民丰县| 文水县| 晋中市| 海晏县| 夏河县| 榆社县| 噶尔县| 任丘市| 浦江县| 大冶市|